
An AX 2012 or NAV system that runs on VMware should not move to Azure VMware Solution (AVS) or Azure VMs as its long-term home. Every AX 2012 release is already out of Microsoft extended support, NAV 2016 left it in April 2026, and NAV 2017 and NAV 2018 follow in January 2027 and January 2028. Replace AX with Dynamics 365 Finance & Operations and NAV with Dynamics 365 Business Central, and rehost only as a short, dated bridge when the VMware renewal leaves no other option.
Key dates: AX 2012 R3 extended support ended on 10 January 2023. NAV 2017 extended support ends on 11 January 2027 and NAV 2018 on 11 January 2028. VMware vSphere 8 reaches end of general support on 11 October 2027. Licence-included pay-as-you-go AVS hosts must move to portable VCF licensing by 31 October 2026.
This post is part of our guide to leaving VMware after Broadcom. The guide covers the whole estate. This post covers the one workload that most often gets the wrong treatment: the old Dynamics ERP sitting on a VMware cluster, usually with its own SQL Server beside it.
The ERP application is only one layer. Each AX or NAV system also needs a database server and an operating system, and those have their own clocks. ERP servers built in the AX 2012 and NAV era often run on one of the platform versions below. This post does not say which versions any particular AX or NAV release supports or runs on, so check your own inventory first.
| Platform | Support position | Extended Security Updates (ESUs) on Azure, as of October 2026 |
|---|---|---|
| SQL Server 2014 | Extended support ended 9 July 2024 | ESUs run until 8 July 2027 and stay free on Azure VMs, AVS and Azure Stack |
| SQL Server 2016 | Extended support ended 14 July 2026 | ESUs run until 17 July 2029, but moving to Azure VMs or AVS no longer makes them free. Billing started at midnight UTC on 15 July 2026 |
| Windows Server 2012 and 2012 R2 | Out of support | The final ESU release shipped on 13 October 2026. Arc-enabled ESU licences were deactivated on 14 October 2026 |
| Windows Server 2016 | Extended support ends 12 January 2027 | ESUs cover Critical and Important updates for up to three years, through 2030. Arc billing starts on 13 January 2027 |
Two points in that table catch people out.
First, the old rule that "Azure gives you free ESUs" no longer holds as a general rule. Microsoft announced on 27 March 2026 that new ESU offerings from 1 April 2026 carry the same pricing inside and outside Azure. Microsoft has not published a page that names Windows Server 2016 and states whether its ESUs are free on Azure VMs or AVS. Budget for them as a cost until Microsoft says otherwise.
Second, NAV 2017 extended support ends on 11 January 2027, one day before Windows Server 2016 extended support ends on 12 January 2027. A NAV 2017 system on Windows Server 2016 loses support at both layers in the same week.
Rehosting means moving the ERP virtual machines as they are, either to AVS (VMware in Azure) or to Azure VMs. It is the right answer for plenty of workloads, and our route guide explains where. It changes the address and little else for an out-of-support ERP.
Azure VMs are the cheaper of the two rehost targets for a single ERP, because they avoid VMware licensing entirely. That makes them a reasonable bridge. They are still a poor destination.
Our view: if the ERP is AX 2012 or NAV, the VMware exit is the moment to replace it. The migration budget and the business attention are already committed. Spending them on moving an unsupported system wastes the one point in the cycle when replacement is cheapest to justify.
Replacing means moving the business onto a current Dynamics 365 product and switching off the old ERP servers along with the VMware hosts under them. The target depends on where you start.
| Current system | Replacement | Where to read more |
|---|---|---|
| Dynamics AX 2012, R2 or R3 | Dynamics 365 Finance & Operations | Finance & Operations and Finance & Operations Essentials |
| Dynamics NAV (2016, 2017, 2018) | Dynamics 365 Business Central | Business Central and ERP migration packs |
Finance & Operations is Microsoft's enterprise ERP for finance, supply chain, manufacturing and HR. AX 2012 customers have two broad paths. A technical upgrade carries the AX data and configuration forward. A fresh implementation starts from standard processes and migrates only the data you need.
We pick between them on one test: do the current AX processes still match how the business works? If they do, an upgrade is faster and less disruptive. Our AX 2012 to D365 Finance upgrade case study shows that path. Years of customisation that built workarounds into AX usually make a fresh implementation cheaper over the life of the system. We explain the risk of carrying old processes forward in Stop mapping your old process onto a new system.
Business Central is Microsoft's cloud ERP for growing businesses, and it is the natural successor for NAV users. The work covers master data and open balances, plus a review of each customisation against what Business Central now does as standard. Integrations that used to talk to an on-premises NAV server also need re-pointing. Our migration packs cover NAV to Business Central as a fixed-scope project.
Step 4 is where we use AI testing. Agents capture how the business processes behave before the change and re-run the same checks afterwards, through the user interface. We already run this for a client whose every release is AI-tested, including UI testing and Azure DevOps bug verification (read the case study). That is release testing, not an ERP migration, but the same approach applies to proving an ERP cutover. More detail is on our agentic software delivery page and in Proving every app still works after a VMware migration.
We recently took an oil and gas company based in Scotland off its own VMware infrastructure. The client is anonymised. We used three routes in the same estate: containerised applications moved from VMware to SUSE Rancher, the ERP was replaced with Dynamics 365 Finance & Operations rather than rehosted, and other workloads moved to Azure services, including the SQL Server estate. Those workloads went to platform services, not only to virtual machines. The oil and gas VMware exit case study describes the project.
That project follows the pattern this post recommends. The ERP left VMware once, as a replacement, while the other workloads took the routes that suited them.
An ERP replacement usually takes longer than moving the rest of the estate, and it needs the business, not just IT. We run it as its own track and start it first. The infrastructure track then works around it.
The VMware platform sometimes will not last until the ERP replacement goes live. The support contract may end first, or the data centre lease may expire. A short rehost is then a sensible bridge, provided you treat it as temporary from day one.
Some organisations moved AX or NAV to AVS before Broadcom changed the licensing. Two Microsoft deadlines now apply to them. Licence-included pay-as-you-go AVS deployments must move to portable VCF by 31 October 2026 to stay compliant. Customers with licence-included reserved instances must exchange them for VCF BYOL reservations, or move off AVS, by 30 August 2027, and a reservation that expires earlier loses the licence-included benefit when it expires. Microsoft also reports BYOL registrations to Broadcom monthly, and it may suspend over-deployed or unregistered private clouds.
Each of those dates forces a licensing decision. We recommend making the ERP replacement decision at the same time, so that you do not buy a VCF subscription to keep an old ERP running on AVS.
Microsoft's migration funding now sits under Azure Accelerate, which Microsoft's page calls Frontier Accelerate for Azure for its FY27 (1 July 2026 to 30 June 2027). The page lists Azure credits, partner engagement funding, funded assessments and Cloud Accelerate Factory, and it names VMware to AVS as a supported scenario. Microsoft partners with the relevant specializations can access these programmes for their customers. Ask your partner which ones apply to your project before you sign a migration budget.
Our VMware exit service starts with an assessment that places every workload on a route, the ERP included, and builds a cost model against your Broadcom renewal. That assessment also produces the replacement plan for AX and NAV estates and, where needed, a dated bridge. The main guide covers the rest of the estate.
Our VMware exit assessment places every workload on a route, including the ERP, and models the cost against your Broadcom renewal. You get a dated plan for the replacement and for anything that needs a short bridge.
Or call us directly: 01625 569 777